Video: Golden Dome: Can You Deliver the Model? From Reference Architecture to Verified Supplier Deliverables with CATIA Magic (Cameo) | Duration: 2584s | Summary: Golden Dome: Can You Deliver the Model? From Reference Architecture to Verified Supplier Deliverables with CATIA Magic (Cameo) | Chapters: Webinar Introduction (7.77s), Golden Dome Architecture (125.79s), Digital Engineering Policy (217.705s), Model-Based Requirements (303.175s), MDA Shield Contracts (398.115s), Five Readiness Capabilities (517.19s), GRA Package Structure (625.94s), Requirements and Traceability (800.145s), Interface Definition (1017.235s), Prime Integration Management (1139.98s), Architecture and Verification (1280.34s), Supplier Readiness Scorecard (1388.395s), Next Steps & Resources (1662.565s), Q&A Session (1747.095s), SysML Version Migration (1969.355s), Mid-Project Migration (2146.88s), Interface Verification Q&A (2214.815s), Model Deployment & CAD (2394.555s), Closing Remarks (2548.185s)
Transcript for "Golden Dome: Can You Deliver the Model? From Reference Architecture to Verified Supplier Deliverables with CATIA Magic (Cameo)":
Good afternoon, everyone. I'd like to thank you all for joining us today. The webinar that we've prepared is a practical follow on to our supplier readiness overview. My name is Daniel Cini. I'm an enterprise account executive for GoEngineer. And today, I'm pleased to be joined by, once again, two of my esteemed MBSE experts, our very own Jamar McDonald and Mark Dietrich of Deso Systems. We'll be sharing some valuable information about Golden Dome readiness for crimes and subcontractors today. Our first session made the case for why model based engineering, model based systems engineering is becoming a qualification signal for Golden Dome work. This session is about the how, how the work is actually done, and just as importantly, how many suppliers do it together collaboratively or how many suppliers do it together collaboratively. We'll focus on, one toolset that is purpose built to support these workflows, the NoMagic portfolio, Cameo Systems Modeler, Simulation Toolkit, and Teamwork Cloud. So stick around and we'll take you through all of it. So first, here's where we're headed. We'll start with the Golden Dome as a system of systems, the digital engineering expectation, and why it's landing now. We'll talk about where your package actually comes from and what readiness requires. We'll then show you what a model based system package looks like coming and going with demo models you can open yourselves. From there, we'll go inside Cameo for the technical how traceability interfaces, the multi supplier reality, and verification, and we'll close with a simple way to place your own team on the path to get started. So with that, I'd like to hand it off to Mark Dietrich. Yeah. Thank you, Danny. And it's great to be back with the Go engineer team and present webinar two. So Golden Dome is a layered homeland defense architecture, space, air, ground, and maritime. There are sensors, interceptors, command and control, and the data networks that tie them together, a classic systems of systems. No one supplier owns it, but every supplier has it fit into it cleanly. So here's the thread that runs through the whole session. We usually talk about reporting up to the prime. You build your piece. You hand your model up. The prime integrate... Integrates it. That's real, but it's half the picture. The harder half is that suppliers are coupled with... To each other. What company a designs constrains company b because they share an interface. When a change... When a changes its side, it lands on b whether anyone sent an email or not. On a program with dozens of subcontractors, that horizontal coupling is where the integration risk concentrates. So the real question isn't how do I model my piece, It's how do many of us model together safely when my work affects yours? So the policy behind this is the DOD shift to digital engineering reinforced by DODI five thousand dot ninety seven. Authoritative models across the life cycle, traceable decisions, and spectacle evidence. Stag documents alone are becoming less persuasive. Now the question we get from a lot of you every time is Cameo mandated. The government mandates digital engineering artifacts and interoperability, not one vendor's product. But the prime on your program dictates the environment, the tool, and the release level as a condition as a condition of participating. So readiness isn't pick your favorite tool. It's be ready to conform to the baseline your prime specifies and contribute cleanly inside it. Same answer and ask what version Golden Dome requires or whether you can use a different SysML tool instead. The prime sets the baseline. You conform, and planning to conform is part of the readiness. So let me define the shift plainly because it's the whole game. Document world, the requirement is text in an RFP. Compliance is a review event. Traceability gets rebuilt by hand every program. On model based world, the requirement is an element in a system l model wired with safety and verify links, and the government hands you a government reference architecture for your design must conform to. A GRA, in the DOD's terms is authoritative source the government provides to guide and constrain the solutions built against it. So the punchline, the model, not the document, is now the medium of exchange, which is why the rest of this session is about working in the model. So a lot of people were asking us, you know, when should we start adopting? You know, why why now, not someday? Because the reform became law, and FY '26, NDAA signed December 25 carries a full title on acquisition reform, portfolio based acquisition, iterative delivery, and a base value standard that weighs the quality of your technical solution, not just cost. You can't run on that stack of documents. It presupposes an authoritarium model the government can evaluate continuously, and it's already inside the Golden Dome. The MDA shield effort explicitly names digital engineering, open systems, and NVSE at real scale, a ten year vehicle up to 50... Pardon me. A $151,000,000,000, interceptor OTAs up to 3,200,000,000... 2,463 offers in the first phase. Treat the figures as order of magnitude, a $151,000,000,000 ceiling through 2035, SBI OTAs up to 3,200,000,000 across 12 companies. The point is that this is where the work is. So a supplier won't get one kind of package. They'll get one of three, and the demands differ. So identify the door first. For government direct, space systems commands runs the space based interceptor work through OTAs outside the far, so more model and data forward. And MDA task shield orders arrive with the MDA expected to... Expectations baked in. Hardware primes flow the government's model down inside their own PLM and digital threat environment. So a tier two tier two lives on the prime's terms, exactly the coupling we just discussed. Now software integrators like Palantir and Anduril build the command and control layer. Their package is an ontology and an API to integrate against, not a SysML spec. So readiness there is data engineering, not a modeling tool. Whichever door, one thing is consist... Is constant, and that's in the next slide. So what does ready mean? There are five capabilities at the level of ideas now because the how comes in the technical half. Requirement traceability. Every requirement linked to the design that satisfies it and the test that verifies it. Interface control, boundaries precise enough to be checked, not just read. Architecture maturity, a real architecture with behavior, not disconnected diagrams. Verification readiness, evidence the design meets its requirements before anything is built, and especially collaboration and governance. The discipline that lets many people and many companies work in one model safely. Those are the five readiness bars, and not by accident, exactly what a prime and a government reviewer look for. Keep them in mind. You'll see each in action. So we covered the expectation and the bar. Before we get into how you build the model, let's be concrete about the thing itself. When a model based opportunity reaches you, what exactly is it that lands in your inbox, and what does compliant response send back? Three quick slides, the anatomy of the package, the real government example, and the demo models your engineer can open this week. So if you screenshot any slide, this is a this is a slide of screenshot. Let's walk it left to right. On the left, the inbound package, an authoritative Cameo model, usually with a read only HTML twin so non Cameo viewers can browse it and rec if so requirements move between tools. A GRA, you must conform to requirements as linked model elements, interface definitions tied to name open standards, a model based statement of objectives inside the government's acquisition and sustainment data package, and a govern... Governance wrapper covering model style, contract terms, and data rights. On the right, your return is the mirror, a conformant solution model instantiated against the GRA, traceability proving satisfy and verify on every allocated requirement, interface, conformance evidence, analysis tied to the model rather than the separate report, and the key shift, the model itself is the deliverable, not a word document exported from it. Some solicitations are bidirectional. You hand an improved version of the government's own model. Everything in the technical half is how you produce the right hand column. So this isn't this isn't a hypothetical. The ATS dash one GRA is a real publicly releasable model based acquisition package, and it's proof the whole thing is operational. Authored in Cameo, shipped as a dot MD ZIP file issued at the RFP stage, and a free Cameo reader means anyone can open it. So there are five files. The the GIF is tailorable requirements and read reference model, your... What you receive. And the IHUB is where you you you... Where industry builds its solutions afterward, your... What you return. And the glossary markings and reference library are the governance that travels with the model. You can request the public copy from the DAF digital transformation office. DOD entities request the CUI version from the ATS program office. If you want to practice on the genuine article who lands on the on the contract, this is the one you pull from. So there are two models your application engineering team or your system engineering team can use today, both in the readiness pack. HSUV lives in every cameo installs example folder. It's the fastest way to show requirements with satisfy verify in every SysML diagram type. So you use it to teach the grammar. The MTC connect model is bundled, opens with no plug in, and its job is to show you the delivery format. A standard shipped as a MDZIP with an HTML twin exactly the way the g r a arise. And one point worth making note that dot m d zip is the native project format of Nomadix cameo tools. So re... Receive and return the model is a native operation, not an import round trip. That's the bridge to the technical half. This is the format. Here's how you work in it. So here's the hinge the whole first half swings on. Strip it down, and a supplier either can work natively in the model or can't. And if they can't, they can't submit a compliant model based response, however good the underlying engineering is. It's binary, open trace extended, and return a native MDZIP or sit outside the HTML twin and answering in the word. Receive it, work in it, return it. And for the rest of the session, I will return this back over to Jamar who will show you how to do all of this inside of Cameo. Thank you. Hi. Thank you, Mark. So now we'll talk about how this is done in three parts in Cameo. First, we'll discuss requirements, traceability, interface control, which is the heart of audio readiness. Next, we'll discuss collaboration, how many companies model together, how a change in one side reaches another, how the prime composes everyone's work, and how we protect, everyone's IP. And finally, verification. How we prove the design works, how tools, versions, roles, and license... Licensing map to all of this. First, let's start off with requirements. So, again, requirements and traceability is where audit readiness begins. In traditional systems engineering, requirements live in a spreadsheet or a requirements tool, and there's no formal link to the design. Really just a a naming convention. However, in Cameo, requirements are brought in from wherever they already exist, or you can create them directly on the software. Either way, they become actual elements. From there, you can build real links. This design satisfies this requirement. This test verifies it. And because those links are real, Cameo generates map matrices for you, and and unverified requirements show up as empty cells as you can see on the bottom right over here. When something upstream changes, impact analysis shows everything downstream it touches. That's what turns a a technical exchange from a document review into a model review. Now interfaces hold the most risks for integration, so they need to be clearly defined. In Cameo, you can define an interface with an internal block diagram. This is where you define the ports, connectors, and item flows that cross the boundary. Ports are typed by interface blocks, so what passes between two components is explicit and is checkable, as seen in the image in the center. White box and black box ICDs can also be generated directly from the model, and this is displayed on the bottom right. As opposed to a traditional system engineering where a document describes the boundary, the model really enforces it. The definition lives in one place, so if two sides stop lining up, it surfaces immediately while you're modeling and not, you know, six months later when you're trying to do integration. The interface becomes a model contract... A a model contract. The agreed definition is what crosses the boundary and the thing coupled suppliers negotiate through. This also supports MOSA, which is a general requirement on a a program of this scale. So this slide here is about supplier to supplier couple... Coupling, and it answers a question that we got after the... A lot after the first session, and that's how to handle, the supplier supplier coupling. Supplier a and supplier b share interface as you can see in the center image. The shared boundary is the controlled object. It's usually owned and governed by the prime or a designated integrator. The suppliers don't see into each other's internal design. They only see the agreed interface. So as a comparison to a document world, a change in supplier's a side is usually an email or a document sent over where internal designs could be leaked or changes aren't communicated in a in a timely fashion. Whereas a governed interface model changes all of that. Change impact flags the change, who authored it, and when the change occurred so you can have access to that immediately. Now we'll kinda discuss how the primes put all this together. So primes employ project usages for building the system. This means, a supplier's model is a reference. The prime composes the out... Overall architecture and checks that interfaces line up without absorbing each supplier's internal design. So each supplier maintains model ownership while the prime assembles the entire system. Primes may also impose a shared modeling standard, for proper integration. So this could include style guides and architecture frameworks such as UAF, and those are... These are published for that reason. Being able to model these, specified standard... Standards are a real readiness skill. So that's something that's worth building before an, RFP enforces that on you. Now none of this is done without internal and external collaboration. Teamwork Cloud is really the shared backbone for all of that. It provides security through role based access, version controlling, baselining, and concurrent modeling. For example, a supplier providing a component gets read access to the interfaces necessary, for the integration. But if you have two couple suppliers, they might need a controlled shared space where both see the shared interface and also the change traffic that goes across the interface. And, again, the prime composes the ecosystem and governs where that boundary exists. Yeah. So each... On that boundary, you'll see the shared interfaces, but you won't see, any of the internal, IP. So role based access is only widened when that's required for the specifics of the project. Now inside the pro... A program, the prime standardizes the modeling software used and the release level of the software. So day to day exchange is native and governed. Now there are standards for moving across tool boundaries, and they they do work, but it's not always seamless. So this is why primes usually enforce a standard on what software to use, what level to use, and you can find that in, the contracts that come from these projects. And a quick note on the language, UAF is still, SysML v one based, so most projects will still be using SysML v one, although we are seeing some, SysML v two coming in the early development. And this all leads to architecture and verification. So the actual architecture is built in layers. This starts with the operational layers, then dives into the logical, physical, and functional layers. At that time, simulation toolkit executes that behavior against the requirements and constraints so the design can be verified before anything is even built as you can see in the center image. You can also use verify matrices to ensure each requirement is aligned with a physical component or behavior depending on the requirement, and you can see that, on the right. A gap found in the model, cost a fraction of the same gap found in integration or qualification. So that's why we're trying to get a lot of this design and and verification and the, early design phases of the project, so you can save a lot of time and cost on all of these. Early model based verification evidence is a genuine differentiator in a proposal review, So it's always good to, be ready for that whenever you're going for those. So that's the how is a review. Requirements and interfaces are connected, model artifacts. Coupling is handled through shared boundaries, project usages, and access tiered governance, and verification is shown early through combining the architecture, with the simulation. So now I'll pass it back off to Danny who will, go over some practical next steps that all of you Thanks, Jamar. can take. So now that we've covered what matters and how it's done, we'll recap the five capabilities you've just seen and show you a simple path to prepare your team for Golden Dome work. Then we'll show a supplier readiness scorecard, which defines the stages. We'll offer a workshop to help you get started quickly and share a self assessment you can take any time to understand where you are today. So this readiness list recaps each capability we just showed. Requirements traceability through the ability to link matrices, interface control where the boundary serves as a model contract, architecture maturity with not only a valid but executable architecture, verification readiness by leveraging evidence before build, and collaboration and governance, enabling many suppliers to collaborate in one governed model, seeing only what they need. This frames how primes identify the most promising candidates among partners and subs for their programs. So here's the supplier readiness scorecard. The scorecard is really just a simple. way to to open Golden Dome supplier readiness, highlighting crucial indicators for each stage. This can be used as a guide to prioritize steps toward full prime readiness instead of trying to solve everything at once. The recommended minimum level for Golden Dome credibility is level three, which we can help you reach relatively quickly, while level four further optimizes for competitiveness and sustained execution. A simple way to place yourself, four levels. One, document set... Centric requirements and ICDs in office and PDF, no connected model. Two, model aware, some models exist, but reviews and traceability are inconsistent. Three, model based, model based requirements, architecture, interfaces, and verification connected in one governed model. And four, prime ready. That governed process is repeatable and auditable across your team. For Golden Dome Pursuit, target level three quickly for proposal credibility, and level four for sustained execution. And here's how you actually place yourself, not by guessing. There's a companion questionnaire in the readiness pack. There are 15 questions, three for each of the five capabilities we've been walking through. And for, and for each, you pick the line that saw... That sounds like you today. Fill out all 15, average per capability, and you've placed your team on this scorecard. Send it back before we meet, and the workshop starts from your real gaps, not a generic pitch. And here's what each jump takes, so going from one level to another. Going from two to three is connecting the pieces into one governed model. Structure stood up, requirements and ICDs are in, your first verification matrix led by a systems engineer and an interface owner. Going from three to four is making it repeatable and auditable. Templates, validation rules, tagged baselines, web reviews, framework views with a verification lead and a configuration manager. Holding four is governed process, training, and reusable templates that carry to the next pursuit. A key point is where Cameo fits into all of this. The MD Zip that you've heard us talk about, that is the, that that that the government ships is the native format of NoMagic's cameo tools. The question is no longer, should you do MBSE? Your customer will hand you the the authoritative model, so the question will become, can you receive it and return it without losing fidelity? The capabilities map one to one onto the readiness legs. Native MD Zip and built in satisfy verify traceability, literally the evidence the return package must contain, SysML and UAF profiles for interface conformance, and Teamwork Cloud with Cameo Collaborator for multi supplier collaboration. That's the lead in to the working session on the next slide. As a next step, we recommend a focused one hour workshop with us tailored to your role in Golden Dome. In that session, we can identify your highest value MBSE use cases, assess your current state, and outline a practical adoption path. The outcome is a concrete readiness plan tailored to your specific priorities and goals. And finally, we even have a convenient self assessment which you can take on our website. You can grab the web address shown or scan the QR code for a link. The assessment is 15 questions and it takes less than five minutes to complete. And it'll produce a scorecard with your level of readiness in the five crucial categories that primes are looking for. So with that, I'd like to thank all of you for your time. You can always discover more at 3ds.com, or goengineer.com. You can connect with me, Mark, or Jamar on LinkedIn or through email. And we look forward to helping you and your team get Golden Dome ready. So now I think we're going to open it up for q and a if we have any questions. Oh, we have an early one. Let's see. We are a tier two sub on a hardware prime's team. If the prime runs a different cameo release than we do, what happens to our model? I'll open that up to Mark or Jamar. Hey. So. So I I... Oh, go go, go. ahead, Jamar. Go ahead. Yeah. So the, the prime usually sets the, tool and release as mentioned in in the webinar. So if you are on a different version, specifically an an older version, then we would usually have you upgrade to, the version that the Prime is using so that everyone is on that same release and that, that transition and transaction of models is efficient. Great. We have another one that just came in. Isn't setting up the model tool all data engineering? Yes. I answered in the chat. That can technically fall under the definition of of data engineering, the actual setting up of the software because that's where, the data is gonna be held that we're gonna be analyzing and building. So, yes, I I can see that following in there. Okay. We have another one. How do we protect our IP if we have to share our model with the prime or with another supplier we're coupled to? I'll take that one, I guess. So you you share the, kind of the agreed interface, not your internal design. So the Prime uses your model by reference without merging it into theirs. Our... The Cameo product Teamwork Cloud, which allows the collaboration access to scope to how tightly you're coupled, a drop in supplier sees only the interface it has to satisfy. So your your your IP would be protected. K. And in the chat, I see that, we have someone that says briefly, GCC h integration, which I'm assuming is GCC high integration. I'll go ahead and take that one. Cameo is definitely set up for GCC high environments. It's it's been operating with primes and subs on multiple programs for many years now. So we do actually deal a lot with high side, low side environments. And, we... The the situation comes up a lot in our implementation setups. So, I'll I'll allow Mark or Jamar to jump in. Correct me if I've misspoken anything, but, Yeah. we're not, I can add on, not really familiar with that. yeah, I can add on to that. Even on the Teamwork cloud side, you need network access, so not Internet Internet access. So you are still able to use, Teamwork cloud and have that collaboration, on the high side as well. Let's see. Here's another one. Is SysML v two going to make what we build in Cameo today obsolete? Yeah. Absolute. So my answer to that would be no. And that that kinda follows on with the question. I'll tie that into a question here we have. One of the key issue, especially for large scale projects to handle the requirements of semantic graph levels with the advancement of b two. I wonder what could be the key benefit of adopting system of b two from b one. Adopting in the middle way of the project can be difficult. Yes. That is that is very true. And so kind of connecting those two questions. System l v one is not going anywhere. It's still gonna be supported on, all of the the cameo releases to come because there are a lot of legacy projects that, the entire model is built in system like v v one. Now whenever it comes to transitioning to v two, there is not a one to one button click for transformation right now. And so part of that that conversation is on if there'll be enough of a benefit moving to system of v two, to go through that transition. If you have a a legacy model that has millions of elements on it, especially if you're doing a lot of, customizations, domain specific language on your, on your profile side, that transition is gonna be a lot harder than, you know, infancy project that doesn't really have a lot of v two modeling because as as you may or may not know, you know, profiling and and model extension looks completely different in SysML v two. In some of the models, there's just not a one to one transition, and so that that transition can be very difficult. And so some projects are choosing to... For the life of that project are gonna stay on SysML v one because there's just not enough benefit for moving to v two. Whereas some of them, depending on where you are in the project, you might wanna be... Take advantage of the, of the textual notation. You know, that's gonna be a lot easier for AI integrations and, having some of your model link done automatically where you can just kinda review, in... And, you know, having that done. And it's gonna be a lot easier for your software engineers who are used to a textual language who might be coming over to systems engineering, if you're not, you know, just hiring someone straight out who already knows the language. So there is a a lot of conversation going on there. Another thing to keep in mind is that SysML v two on the simulation side is still being built out. So if you're using heavy simulation, you're probably gonna wanna stay on SysML v one, because the the simulation isn't quite there yet as far as the language goes, not even the tooling. So there... There's a lot of conversation around that, but, no, SysML v one is not going anywhere. SysML v two will not make SysML v one obsolete for those legacy projects. But moving forward, you are gonna see a lot of more... A lot more projects using v two because it is the future, but it's not gonna replace every project that's using v one. Yeah. As a follow-up, I saw a a question come in about potentially migrating mid project. You know, that's really gonna be left to the the the contracting entity or the prime to decide what they're going to do. I would... I... I'm I'm highly, skeptical of a huge transition from v one to v two in the middle of an existing project. But over time, as new projects emerge, they could be... Began to be done in v two. But I think at this point in time, if the project has started in v one, it's probably gonna stay in v one through its life cycle. I I mean, who knows what can happen, but that would be what I would think would happen. Just knowing how risk averse, you know, kinda these programs are to to change over midstream, you know, is is gonna be kind of a heavy lift. So... But that would be decided by, by the prime or or the government. So we have another another question and I don't know if you guys touched on this, but, someone asks, do you have any general recommendations or are there any good practices for how to automate or at least define a government process for verification of interface requirements, particularly for non data interfaces within the model? Okay. Just a second. And, Mark, if you have anything in the meantime, let me read and think on that. That might be a... Who's that from? Is that from... That's from Robert Helm. Okay. Hey. Hey, Robert. That might be a good thing to talk through offline with you. At some point, maybe, set up a call with you to do that. Yeah. If you're open into that. a methodology and workflows, I. would think. Really, really, more than we could probably discuss here. But, yeah, we we... I. think that... on, Let's... everyone. Settle in. Let's. just keep be. here for a couple. hours. Let's just take your questions and just do it and go for it. You know? We'll make this a fireside chat. Or or maybe, maybe maybe Jamar can answer something kind of in the brief. Do you have any documentation practice for that? I made verification of. I think that automating workflows and everything starts to become an individual, thing. It's also one of the areas that are kind of exciting in the cameo world because we're all looking to what the newer capabilities that, SysML v two is enabling with automation and integration to a secure AI interface. So I would I would propose that that... That's also a changing landscape right now. It's evolving and becoming a lot more efficient. So that's another reason why I think Mark recommends we have a conversation. That's where we can kind of share some details about, you know, one of the 100 ways that, you might have available to start automating processes going forward. Then off off the top, I would say, it does require some initial modeling. But as I mentioned in the, presentation, whenever you, have your ports and you have those typed by the interface blocks, it does, you're only allowed to send certain traffic, across those ports and interfaces. So that is... It will flag you when in creating that. I know you said particularly for non data interfaces, but even if it's not data, whatever whatever... Because the the interface is there for some reason. So whatever is is going across that interface will be, flagged if it's not the correct, you know, data energy, you know, fluids, whatever is going across the interface, it will automatically, throw flag at you if it's not the right thing. But Okay. but definitely, yeah, deeper a deeper conversation. Okay. And we had, one more question I don't want us to miss. Andrew asks, how are the models created, I e, in a cloud or local, and what CAD is typically the choice? So any of us can answer that. I'm gonna left... Leave it to the experts. So they're generally created, in in the cloud. Well, I say in the cloud. So Teamwork Cloud is an on premise software. So it's it's your data. It's on your servers. You have control over who has access, and things of that nature. But they're they're generally created with Teamwork Cloud. Now there are some, you know, smaller contractors who don't have a lot of systems engineers who might keep it local. I I don't personally recommend that even if you're only using... Only have one engineer. I know a bit... A lot of the talk about Tumor Cloud is the collaboration, but the other half of that is version control. So if you, you know, something happens to that computer, that file system, or if you're looking to, walk back some of your changes or if you're looking to baseline, a lot of all that is easier with Teamwork Cloud even if you're a single modeler who's doing all of your modeling work. You you always have access to all of that data. And now usually what I see... I mean, it depends on the project, and Mark might have a a answer to this, but the the CAD that's used is usually SolidWorks. And there is a way to connect that, have that traceability, through the through the experience platform with some of the roles there so you can, connect some of your physical requirements over to your, CAD designs. Yeah. The CAD is kind of, for Cameo itself, it... It's really CAD agnostic. You know, the back. end could be whatever the prime is using to do its, you know, physical mechanical design. Back to the question regarding, the cloud issue. So Cameo itself as a as a systems, tool entry tool is a desktop application. So it's a desktop application for Cameo. But as Jamar mentioned, you you put... You can put your... You can, put your data up in Teamwork cloud. So you can host your data elsewhere, but the actual work you would be doing as far as building block diagrams and checking requirements and all that kind of stuff would be on a desktop, application. Alright. Any other questions? Those were some good ones. We appreciate it. Alright. I didn't wanna leave anyone out, so I gave us a good amount. We really appreciate everyone joining us today. And, stay tuned. Feel free to reach out to us. If you have any further questions, we're always happy to meet and, answer any specific questions that you have and help you on this path, to Golden Dome. Thank you very much.